The human element continues to pose challenges:Almost half(47%)of low maturity firms say they lack the expertise to understand which connectivity technologies to invest in,indicating a skills gap.Even high maturity firms report that it is not easy for them to access the insights they need to make labor planning and safety decisions.
人的因素继续带来挑战。近一半(47%)的低成熟度企业表示,他们缺乏专业知识,无法理解应该投资哪些连接技术,这表明存在技能差距。即使是高成熟度的企业也表示,他们不容易获得做出人力规划和安全决策所需的洞察力。
CVI Laser Corporation 25-5012L Coating BSR 5300-1/as
Tescom 64-2860KRT10 High Purity Flow Regulator Valve
Varian Sorption Pump with Styrofoam Dewar 9416501
MKS Nor Cal Adaptor NW-100 Flange to 6.5 inch ASA Flang
Durair II Pneumatic Actuator AP050 N, Double Acting, 1”
VERIFLO High Purity/Pressure Regulator 959100W2PFSMM
LAM Collar Pinned Lifter 8” 715-032760-008