Description
用前准备
运行前必须检查各通信口、I/O功能、控制算法功能是否满足要求;在工程师站上对模件状态进行检查符合要求;在模件内装入组态,检查是否正确。
Indramat TBM, bleeder TBM, Frein Indramat TBM, Indramat AC Servo Bleeder :
TBM 1.2-040-W1/115, TBM 1.2-40-W1-024, TBM 1.2-40-W1-115, TBM 1.1-020-W1, TBM 1.2-20/220V, TBM: 1.1-20-W1, TBM 1.2-40-W1-0, TBM 1.2-040-W1, TBM 1.1-20-W1-115, TBM1120W1115, TBM1.1, TBM1.2,