Description
敷设电缆时尤其要注意强电弱电分开,屏蔽线的可靠接地和抗干扰。在布线过程中一定要按照设计图纸(一定已交专人认真审核),照图施工,在接线中,电缆及芯线标记要清晰完整,能长期保持;压接端子必须用预绝缘管装端头处理。
FANUC A16B-1211-0850 POWER UNIT, tested warranty
FANUC Positioning Module PT01A A03B-0801-C051
ASEA Brown Boveri, ABB DSPC 150
Dynapath delta CNC 420515D operator panel
420515D Dynapath delta CNC operator panel, tested
Dynapath delta CNC CRT 9″ Autocon 4204369 V20931042